Cloud & platform engineering — senior only

Infrastructure that ships faster than your roadmap.

BluePeak is a 28-engineer consultancy that migrates, secures, and operates production cloud for SaaS companies and regulated workloads — AWS, GCP, and Azure, all of it in Terraform, all of it measured.

Est. 2016Senior-only bench
120+Prod migrations
24/7On-call SRE desk
AWS GCP Azure Kubernetes Terraform Argo CD Datadog SOC 2 · HIPAA · PCI scopes
120+

Production migrations delivered since 2016 — lift-and-shift through full re-platform.

−41%

Median cloud-spend reduction on the first FinOps pass, before reserved-capacity work.

99.98%

Aggregate uptime across managed fleets, trailing twelve months, client-measured.

14d

Median kickoff-to-first-production-deploy on new platform engagements.

01

Service lines

Six practices. Every deliverable in writing.

No "digital transformation" retainers. Each engagement starts with a written scope, a named engineer pod, and the metrics it will move — then we ship against that.

S-01 Cloud migration & landing zones Datacenter exits and provider-to-provider moves on a phased runbook — account vending, network topology, IAM baselines, cutover rehearsals. AWS / GCP / AzureRunbook + rollback
S-02 Kubernetes & platform engineering Production EKS/GKE fleets, internal developer platforms, golden-path templates — so product teams self-serve instead of filing tickets. EKS · GKEIDP / Backstage
S-03 Security & compliance audits Attack-surface reviews, IAM least-privilege rewrites, and evidence pipelines mapped to SOC 2, HIPAA, and PCI controls — audit-ready, not audit-anxious. SOC 2 · HIPAA · PCIEvidence pipeline
S-04 Managed infrastructure & SRE A staffed 24/7 on-call desk, SLO dashboards, patching and DR drills on a published cadence — your engineers stay on the roadmap. 24/7 on-callSLOs + error budgets
S-05 CI/CD & release engineering Pipeline rebuilds that take deploys from ceremony to non-event — progressive delivery, canaries, automated rollback, preview environments. GitOps / ArgoPreview envs
S-06 Cost optimization & FinOps Spend tagged to teams, right-sizing with load evidence, commitment strategy — savings you can read in the next invoice, not a slide deck. Cost allocationRI / SP strategy
02

Engagement results

Numbers with a workload attached.

Client names anonymized per NDA — the scopes, constraints, and measured deltas are real patterns from our engagement history.

Healthcare SaaS · HIPAA

Meridian Health

Lift-and-shift monolith re-platformed to EKS with a full HIPAA control map — encrypted data plane, audit evidence emitted to a compliance bucket on every deploy.

11×deploy frequency
−63%p95 API latency
0findings, first audit
Constraint
No maintenance window over 20 minutes
Term
Year 2 · managed SRE

Payments · PCI-DSS

Corvid Pay

FinOps overhaul plus a PCI segmentation rebuild — CDE scope cut to a dedicated account, spend re-allocated to commitments matched to real load curves.

−41%monthly cloud spend
99.99%uptime since cutover
9wkto audit-ready
Constraint
Cardholder data could not leave region
Term
Quarter 4 · embedded pod

Logistics platform · B2B

Atlas Freight

38 services cut over to a new GCP landing zone during live operations — shadow-traffic rehearsal, then a scripted cutover the on-call team slept through.

0downtime minutes
38services migrated
−72%on-call pages
Constraint
Live fleet telemetry, 24/7 ingest
Term
10-week migration sprint
03

How an engagement runs

Week-bounded. Metric-gated.

Every BluePeak engagement follows the same shape. If we can't move the agreed metric inside the agreed window, the next milestone doesn't bill.

Audit & architecture review

Weeks 0–2

We read your Terraform, your IAM graph, and your last three invoices. Out: a written findings report — risk-ranked, priced, and argued over with your team before anyone touches a resource.

Blueprint & landing zone

Weeks 3–5

Target architecture reviewed line-by-line with your leads, then a working landing zone — accounts, network, guardrails, observability — lands in code. First prod workload deploys inside the window.

Migration sprints

Weeks 6–10

Workloads move in dependency order, each with a rehearsal and a rollback tested before it matters. Weekly cutover notes, a live progress board, and no Friday-afternoon surprises.

Operate or hand off

Ongoing

Either our SRE desk runs it — 24/7 on-call, SLOs, DR drills — or we hand your team the keys with runbooks, training sessions, and a 30-day shadow period. Your call, priced both ways.

04

Managed operations

What "managed" actually means.

Symmetric aisle of server racks in a dark datacenter, lit by status LEDs
Managed fleet — production zone, us-east Fig. 01
  • 24/7 staffed on-call, not a pager rotation. A dedicated pod carries your alerts — median acknowledge time under four minutes.
  • SLOs with error budgets. Agreed availability targets in writing; burn-rate alerts before the budget is gone, not after the outage.
  • Patch & upgrade cadence. OS, cluster, and dependency upgrades on a published schedule — no two-year-old control planes.
  • DR drills, quarterly. Restores rehearsed against production-shaped data. A backup nobody has restored is a rumor.
  • Cost watch included. Anomaly alerts and a monthly spend review — managed fleets stay inside the FinOps guardrails.
  • Everything in Terraform. No console snowflakes. Any change lands as a reviewed commit — auditable, revertible.
"BluePeak ran our migration like a product launch — a working environment every Friday, a metrics review every Monday. When the HIPAA auditor asked for the evidence binder, we exported it from the pipeline in an afternoon." Mara Ellison — VP Engineering, Meridian Health

Engagement models

Sprint
Fixed-scope 6–10 week build — migration, audit, or platform pod. Priced flat.
Embedded
2–4 senior engineers inside your team, sprint-cadenced, knowledge-transfer by default.
Managed
Monthly SRE retainer — on-call, patching, SLOs, and the monthly ops review.

Start a scope

Tell us the workload.
We'll bring the runbook.

A 45-minute architecture call, a written findings summary inside five business days, and a fixed quote before anything is scoped. No obligation past the first call.

Response
Inside one business day
Book the architecture call →